Our company celebrates 70 years of founding in July, 2002.
Since its inception, the company has directed the policy to make all of its products by itself.
In addition, the company has adopted the aluminum casting frame of the company injection early, and it has consistently produced the technology of the yodo Gawa river continuously from the material processing to the product painting.
In particular, the grinder with the dust collector released in 1938 grew up to the new standard of the industry. Our company has developed our own premium efficiency motor (top runner ie3).
We would like to make this consistent system to be a turning point in the 70th anniversary of the founding of the founding industry.
We are committed to the production of various kinds of certification, such as "wind (energy) (wind blowers)" and "comfortable environment making (dust collecting machine)" which improves productivity.
Founder of July 1948
Established in 1chome, Shonai CHO, Toyonaka City, Osaka Prefecture
July 1948: production of industrial motors, power tools and recorders
Production of electric blower in September, 1949
December 1961: the headquarters and factories were moved to the present location
March 1962: Tokyo office opened in Azabu, Minato ward, Tokyo
July 1969 dust collector 1 release
January, 1970, grinder with dust collection equipment
October, 1973: the Tokyo office was moved to its current location
July, 1975, dust grinder equipped with dust collector
Establishment of Nagoya office in June, 1977
May, 1978: Fukuoka office opened
January 1991
In November 1994, shinichiro NII assumed the new president
March 1999
Air blown workstation YMS series 2008
January 2011 air blown workstation yms20j series
In April 2013, the company developed premium efficiency (ie3) motor
In August 2013, premium development efficiency (ie3) motor development (1.5 kW, 2.2 kW)
In April 2015, it is equipped with all kinds of IE 3 motors with more than 0.75 kw
January 2017 series dust collector with dust collection equipment "slim" release
Blower as a source of wind energy. It is installed in a very wide range of equipment and equipment, and it has various purpose and environmental conditions.
Please come and enjoy the high quality and high performance Yodogawa electric blower produced from the consistent production system.
We can flexibly respond to the customary tailoring to customers.
Motor output range: 0.03 kW (30 W) ~ 2.2 kw
Maximum wind range: 1.1 MB / min
Maximum static pressure range: 0.27 kPa to 9.81 kPa
Blower sirocco type (0.125-1.5 kW) Cn CCN vCn Maximum air flow Maximum static pressure |
|
Blower plate type (0.045-1.5 kW) N Maximum wind mass Maximum static pressure |
|
Blower turbo type (0.125-2.2 kW) BN / DH / KDH Maximum wind Maximum static pressure |
|
Blowers multistage turbo type (0.4 to 1.5 kW) HB Maximum wind Maximum static pressure |
|
Blowers low noise type (0.4 to 1.5 kW) La Maximum air flow Maximum static pressure |
|
Blowers small (0.03 to 0.047 kW) Y 2S Maximum air flow Maximum static pressure |